New South Wales

Gullen Range Wind Farm

AUSREO’S DELIVERY METHOD SPED UP OUR FIXING PROCESS AND ACTUALLY HELPED THE STEEL FIXERS COMPLETE THE PROJECT MORE EFFICIENTLY AND ON TIME.

Ausreo delivered the steel pre-slung on a hiab truck and we co-ordinated with the driver to place the steel on the ground in a sequence that helped our steel fixers tie the steel very quickly.

- Nathan King, CATCON Project Manager

Builder:

CATCON

Client:

Goldwind

Location:

Crookwell, NSW

Steel Tonnes:

3,500

3D modelling improves productivity

The complex Dome shaped tower bases were modelled and scheduled using our proprietary 3D modelling software based on Auto CAD. The program provided accurate marking plans and identified potential placement issues, thereby ensuring all elements fit neatly together once delivered on site.

Off-site manufacturing drives efficiency

AUSREO prefabricated piles in their quality controlled factory for the project. Off-site manufacturing reduced expensive on site labour, as well as provided greater certainty of delivery.

Pre-slung loads save time and are safer

The switch to pre-slung loads doesn’t just add valuable efficiencies on site. It also eliminates 'fall from height' hazards because operators no longer need to climb onto the trailers.